Before production
Approve the sample and artwork revisions. Agree the measurements, tolerances, functions and finish to check.
Define the checks for your approved model and market. Review the sample, product specification and packing, then agree what the inspection record should show.
Use the agreed specification to set the reference. Record the order, lot, sample revision, inspector and date with the actual readings and findings.
| Check | Reference and result to record |
|---|---|
| Capacity | 500 ml Measured fill and the agreed method. |
| Open and folded size | Ø13 × 5 cm (open); Ø13 × 1.3 cm (folded) Both measurements and the agreed tolerance. |
| Attachment | Separate carabiner + loop Hardware present, fit and folding action. |
| Retail pack | Individual OPP bag or optional kraft hang-tag; 100 pcs per master carton Units counted, packaging version and carton marks. |
Approve the sample and artwork revisions. Agree the measurements, tolerances, functions and finish to check.
Agree which construction, appearance and functional checks to record, along with the timing and reporting needs.
Check the retail pack, quantities, carton marks and protection against the approved packing brief. Request the final report with your order reference.
Agree the applicable checks, method and report scope for the selected model and market.
For a final inspection report, share the order, SKU and destination. For material or test documents, include the finish and configuration you are reviewing.
Review the named holder, covered model or material, dates and stated conditions for your market.
For independent inspection, agree the inspection stage, method, responsibilities and charges with the order.
Materials and claims